The straw was placed in the zig zag manner. Six layered of straw with a depth of 2 feet was prepared and spawning was done @ 2 % (dry weight basis) between the layers. The entire bed was compacted and watered if needed to maintain the moisture. The beds were covered with polythene sheet.