1. Immediate settlement. Provided there is an adequate factor of safety for the bearing capacity of
the piles and pile groups, the immediate settlement si is often ignored. This is because the load is
usually transferred to a great depth and the overburden pressure limits the ability of the saturated
clay to squeeze out from beneath the bottom of the piles