Implementation and Obtained Results
In order to illustrate the theoretical results, the power planning
(24 h ahead) of the load forecasting (see Fig. 6) is
considered, as well as the estimated PV power (see Fig. 5) with
t0 = 7h00 and Δt= 12h30. Estimations of the required energy
for the loads ( _ ELoad_day) and the available energy from the PV
panels( _ EPV _day) during the day (t0 < t < t0 +Δt) show that
too much renewable energy is available (see Fig. 7).
As the gas microturbine must produce the minimum energy
during the day, the surplus energy is estimated as