Dear Mr. Gregory.
On that line place that cable is need is written “Linking SDB WTP to the blowers shelter in construction”.
The blowers shelter in construction is at the Septic tanks area. Power to that point need 70 meters of specified cable. We will install a breaker at the spare reserved place inside the water treatment SDB. Then, from this spare we will energize the Septic tank area.
Please note that we have a confusion regarding the cable name. Cross section picture is what we want. I will not rewrite the confusion here.
Thanks