13. Are procedures in place to verify the physical integrity of the container prior to stuffing including:
• Reliability of locking mechanisms
• Front Wall
• Left Side
• Right Side
• Floor
• Ceiling/Roof
• Inside/Outside Doors
• Outside/Undercarriage