Confirmation of general drainage concept including detailed estimates
of paved and unpaved areas, integrated system of canals, culverts, curb and gutter systems etc. for the 3rd Runway plus associated taxiways, the 1st Midfield Satellite Aprons and the new Cross Taxiways and areas directly affected by surface water run-off from these zones