This project is intended to bring a production system (Pull System) to pull a tool in reducing losses in production system from the study data, it was found that the system of a production order to the production system or a production system pushed (Push System), high times in production. The inventory quantity in process more than necessary, and there is a ready-made stock a lot. The procedures of the project. A search of the meaning of wasteland in the production process using a flow diagram of raw material and information (MIFC), analyze the cause of the problem and find a way using a table causes the stop and correct position (Stagnation List) using the table list updated (Kaizen List), and then write the diagram the flow of raw materials and target information. Then make adjustments by creating pull production systems using the kanban system for inventory control, the inventory during the whole process and finished inventory. The result of the operation of the project from the production system, the retrieved is used to improve the production system makes it possible to reduce the time taken to produce a time in producing up to 44.8 reduced 36 days or days to 19.6% and our. ...