Cowdung, poultry manures and vermicompost were applied before four days of final land preparation. Forty days old seedlings of BRRI dhan 28 were transplanted on Ist January, 2011 at two seedlings in a spacing of 20 cm × 20 cm. Intercultural operations were done whenever required. The crop was harvested at full maturity when 80-90% of the grains were turned into straw color on 20th May, 2011.