The Employer or Engineer shall signify his approval or disapproval thereof. If he fails to do so within the time given in the Contract or the Work Schedule, or if no time limit is specified, within 28 days of receipt, they shall be deemed to be approved.
Approved drawings, samples and models shall be signed or otherwise identified by the Employer or Engineer.