Regarding the M&E designs of the Caddy Store and Eastin Hotel shown, the design for the routing and civil/building/M&E work required for the connection of the hotel and caddy store’s system to the existing facilities and/or future hotel reception lobby is unclear, examples are:
1) Emergency power supply from existing generator to the Caddy and Hotels;
2) Fire Alarm system from Caddy and Hotel connect to Server room / Hotel Lobby Reception / Control room
3) Security system from Caddy and Hotel connect to Server room / Hotel Lobby Reception / Control room
4) IT, telephone and networking system and others
I would suggest these shall be coordinated by TBP and WSP (and may be DWP if required) as soon as possible, and the costs shall be under the Renovation-Infrastructure Upgrade budget (if any) as they are not included in the Eastin Hotel design or budget/cost at the moment.