Carigali Hess is a joint venture Oil and Gas company between PCJDA Ltd and Hess Oil company of Thailand Ltd besed in Kuala Lumpur engaged in gas production in Block A-18 of the Joint Development Area administered by the Malaysian-Thailand Joint Authority (MTJA). The block is located approximately 150km NE of Kota Bahru in approximately 60m of water. The facilities include central gas processing facilities at Cakerawala Production platform , a riser platform, a bridge-linked wellhead platform (CKA) and a number of remote wellhead platforms (WHPs). Carigali Hess is in fabrication phase for a BOOSTER compression platform, to be bridge-linked to facilities at the central processing area, and is expected to be ready to operate in 2015.