The winner of the tender to deliver 200 electric passenger cars by gradual delivery into three periods as detailed below.
5.1 The period within 180 days from the date of signing the contract winner must deliver electric bus delivery of 50 vehicles.
5.2 The period within 240 days from the date of signing the contract winner must deliver electric bus delivery of 50 vehicles.
5.1 The period within 300 days from the date of signing the contract winner must deliver electric bus delivery of 100 vehicles.