Dear All,
   Please find attached survey sketch that has been carried out for the possibility of shifting the Bridge structure and positioning of Tunnel Sleeper at AFP. (Both AutoCAD and PDF files are attached for your reference) 

Note:-

 1) The 16" Pipeline shown on the attached sketch is found 1.25m away from where it should be.
 2)  The existing 20" Pipeline (M-AFP-20-4) is found at a location shown on the attached sketch. (Fix has been taken by surveyor for your reference) 
          - The 20" Pipeline is also some how away from where it should be on the given data

   3) 3" Power cable (High lighted on brown color in the attached sketch) is exposed from a certain location. Please note that only the highlighted sketch is visible and the rest of the cable closer to the proposed Tunnel Sleeper is buried. 
  4) No Power cable has been observed between the two legs of the proposed Tunnel sleeper. The power cable emerges from the right side of the tunnel sleeper shown in the attached sketch  
  5) Regular S-2400 Sleeper was found out of the proposed AFP-ZC Spool route as shown on the attached sketch. (Fix has been for your reference) 

  - Diver has take measurement from the 6 o'clock position of AFP-ZC Riser tube turn pipe to seabed and height is 2450mm
  - Diver has take measurement from the 6 o'clock position of AFP-ZB Riser tube turn pipe to seabed and height is 1900mm (Same measurement was carried out previously also) 
- Pneumo has been taken at the 12 o'clock of AFP-ZC Riser flange and it is 48.5m
- Pneumo has been taken at the 12 o'clock of AFP-ZB Riser flange and it is 49m
  

Remark:-
  - The height for AFP-ZC Riser is almost same as the design. The originally proposed  TS-2400 sleeper serves the purpose but needs shifting to avoid falling of the sleeper foot print on the exposed power cable.
  - BT-2400 needs to be shifted towards the 16" Pipeline as it will clash with the 20" Pipeline at newly proposed location. 
  - Height of AFP-ZB Riser is 1900mm from seabed to 6 o'clock. (Need clarification how to rectify the spool by positioning the BT-2400 10.5m. I assume AFP-ZB fixed spool will me modified by introducing a goose neck..) 
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
เรียนทุกท่าน กรุณาค้นหาร่างแบบสำรวจที่แนบมาที่มีการดำเนินการสำหรับความเป็นไปได้ของการขยับโครงสร้างสะพาน และการวางตำแหน่งของนอนแอร์อุโมงค์ที่ AFP (ไฟล์ AutoCAD และไฟล์ PDF ที่แนบสำหรับการอ้างอิงของคุณ) หมายเหตุ: - 1 16" ขั้นตอนที่แสดงบนร่างแนบพบ 1.25 เมตรจากที่มันควรจะ 2)ที่มีอยู่ 20" ไปป์ไลน์ (M-AFP-20-4) จะพบในตำแหน่งที่แสดงในแนบร่าง (แก้ไขนำ โดยเมเนจเมนท์สำหรับการอ้างอิงของคุณ) -20" ไปป์ไลน์เป็นบางวิธีไปจากที่ควรมีกับข้อมูล 3) สายไฟ (ไฟส่องสว่างสีน้ำตาลในร่างแนบสูง) 3" จะถูกเปิดเผยจากที่ตั้ง โปรด ทราบว่า เฉพาะร่างเน้นอยู่ฝังส่วนเหลือของสายใกล้จะนอนแอร์อุโมงค์นำเสนอ 4) สายไฟไม่ได้ถูกตรวจสอบระหว่างขาทั้งสองของนอนแอร์อุโมงค์เสนอ สายไฟขึ้นจากด้านขวาของนอนแอร์อุโมงค์ที่แสดงในแนบร่าง 5) นอนแอร์ S 2400 ปกติพบจากกระบวนการ AFP ZC แปเสนอตามที่แสดงในแนบร่าง (แก้ไขได้รับการอ้างอิงของคุณ) -นักดำน้ำมีใช้วัดจาก 6 โมงตำแหน่งของ AFP ZC Riser หลอดท่อเปิดสู่ก้นทะเล และ 2450 มม.ความสูง -นักดำน้ำมีใช้วัดจาก 6 โมงตำแหน่งของ AFP-ZB Riser หลอดท่อเปิดสู่ก้นทะเล และความสูง 1900 มม. (วัดเดียวกันได้ดำเนินการก่อนหน้านี้ยัง) -นำ Pneumo ที่เที่ยงของแปลน AFP ZC Riser และเป็น 48.5 เมตร-นำ Pneumo ที่เที่ยงของแปลน AFP-ZB Riser และเป็น 49m  หมายเหตุ: - -ความสูงสำหรับ AFP ZC Riser จะเกือบเหมือนกับการออกแบบ นอนแอร์ TS-2400 เดิมเสนอบริการวัตถุประสงค์ แต่จำเป็นต้องหลีกเลี่ยงการล้มลงของเท้านอนแอร์พิมพ์บนสายไฟสัมผัส -2400 บีทีต้องเปลี่ยนไปทาง 16" ไปป์ไลน์เป็นมันจะแคลช ด้วย 20" ขั้นตอนที่เสนอใหม่ -ความสูงของ AFP-ZB Riser 1900mm จากก้นทะเลไป 6 โมงได้ (ได้ชี้แจงวิธีการแก้การแปโดย BT-2400 10.5m ผมถือว่า คงแป ZB AFP จะฉันปรับเปลี่ยน โดยการแนะนำคอห่าน...)
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
Dear All,
   Please find attached survey sketch that has been carried out for the possibility of shifting the Bridge structure and positioning of Tunnel Sleeper at AFP. (Both AutoCAD and PDF files are attached for your reference) 

Note:-

 1) The 16" Pipeline shown on the attached sketch is found 1.25m away from where it should be.
 2)  The existing 20" Pipeline (M-AFP-20-4) is found at a location shown on the attached sketch. (Fix has been taken by surveyor for your reference) 
          - The 20" Pipeline is also some how away from where it should be on the given data

   3) 3" Power cable (High lighted on brown color in the attached sketch) is exposed from a certain location. Please note that only the highlighted sketch is visible and the rest of the cable closer to the proposed Tunnel Sleeper is buried. 
  4) No Power cable has been observed between the two legs of the proposed Tunnel sleeper. The power cable emerges from the right side of the tunnel sleeper shown in the attached sketch  
  5) Regular S-2400 Sleeper was found out of the proposed AFP-ZC Spool route as shown on the attached sketch. (Fix has been for your reference) 

  - Diver has take measurement from the 6 o'clock position of AFP-ZC Riser tube turn pipe to seabed and height is 2450mm
  - Diver has take measurement from the 6 o'clock position of AFP-ZB Riser tube turn pipe to seabed and height is 1900mm (Same measurement was carried out previously also) 
- Pneumo has been taken at the 12 o'clock of AFP-ZC Riser flange and it is 48.5m
- Pneumo has been taken at the 12 o'clock of AFP-ZB Riser flange and it is 49m
  

Remark:-
  - The height for AFP-ZC Riser is almost same as the design. The originally proposed  TS-2400 sleeper serves the purpose but needs shifting to avoid falling of the sleeper foot print on the exposed power cable.
  - BT-2400 needs to be shifted towards the 16" Pipeline as it will clash with the 20" Pipeline at newly proposed location. 
  - Height of AFP-ZB Riser is 1900mm from seabed to 6 o'clock. (Need clarification how to rectify the spool by positioning the BT-2400 10.5m. I assume AFP-ZB fixed spool will me modified by introducing a goose neck..) 
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
ที่รักทุกคน
อะไรรึเปล่าโปรดพบแนบร่างการสำรวจที่ได้ดำเนินการออกสำหรับความเป็นไปได้ของการเปลี่ยนโครงสร้างและการวางตำแหน่งของสะพานรถไฟลอดอุโมงค์ที่ AFP ( ทั้ง AutoCAD และไฟล์แนบสำหรับการอ้างอิงของคุณ ) ทราบไหม

-

ไหม 1 ) 16 " ไปแสดงบนร่างแนบพบ 1.25m ห่างจากที่ๆมันควรอยู่
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2024 I Love Translation. All reserved.

E-mail: