All cofiring scenarios therefore require imports—the level of which depends entirely on the proportion to be cofired. It is assumed in this analysis that all available resources of each biomass type will be consumed for electricity generation, with the balance met through imports, at an assumed cost of h6–8/GJ, based on current Bord na Mona estimates.