GENERAL INSTALLATION COMMENTS (EPC)
The described activities are taking place on site.
INSTALLATION ARRANGEMENT
Prepare for erection and installation.
Transport of electrical equipment from the storage to the installation place
and unpacking.
Check that the equipment is complete and free of damage.
ERECTION AND INSTALLATION
The electrical installation work shall in all respect comply with the
requirements of provided installation drawings and instructions and local
standards and norms.
Alignment, adjustment and erection according to instruction and drawings
provided prior to the start of the installation work.
VERIFICATION, TEST AND START-UP
Visual inspection is carried out to accept readiness for testing.
After completion of installation the equipment is tested to verify correct
installation.
Insulation test of power cables is performed before energizing.