For 3.1, what is the best way to do integration test and set a plan to deploy?
In the report, these bug still in status: Assigned. Please check and update the status.
4316
If the bug still has some exception that you have not figured out a way to do it yet or has some imperfection and this imperfection does not have "serious" impact on usability of the software, you can make note about the exception, and create a new bug in release 3.2 to work on these exception.