The Contractor shall furnish all materials required to install the O-Cell, conduct the load
test, and remove the load test apparatus as required. The Contractor shall furnish one (1)
or more O-Cells as required for each load test. The O-Cell(s) to be provided shall have a
bi-directional capacity as called for in the project plans and/or contract documents and
shall be equipped with all necessary hydraulic lines, fittings, pressure source, pressure
gage and telltale devices