The physical infrastructure is less of a constraint. The major problems are the road to the east of Phnom Penh to Neak Luong and the bridge over the Mekong River at that point. The road is being upgraded by ADB and the bridge is already under construction (Does this need update?) with the assistance of the Government of Japan