The island has the following facilities for the disposal of its waste: Three operating
dumps (9 more in project), three open landfills, two transfer stations (5 additional
planned), one anaerobic digestion composting facility capable of receiving 20,000 t/yr. of
organic waste, and one waste to energy facility.
The WTE facility started operations in 2002, and it was developed by CACEM to treat
the waste of its four municipalities. It has a capacity of 112,000 tons/yr.34 (30% of the
island’s waste), including 600 tons of medical waste. The calorific value of the waste
received in the facility is between 4.2 and 8.4 MJ/kg34, and generates between 40,000 and
45,000 MWh/yr.34 of electricity (4% of Martinique’s electricity consumption), which is
sold to the grid. The facility consists of two parallel lines, capable of handling 7 tons/hour
each, and operates 8,000 hours/year.34
Sud เดอลามาร์ตินีก), และ SMITOM (Syndicat Mixte เทเลอ Traitement เด OrduresMénagères เดอลามาร์ตินีก)เกาะแห่งนี้มีสิ่งอำนวยความสะดวกต่อการกำจัดของเสียของ: ปฏิบัติการ 3เชื่อมซึม (9 เพิ่มเติมในโครงการ), สามเปิด landfills โอนย้ายสถานี (5 เพิ่มเติมการวางแผน), หนึ่งไม่ใช้ย่อยอาหารหมักสิ่งอำนวยความสะดวกสามารถรับ 20000 t/หน้า สปอร์ตของอินทรีย์ และหนึ่งเสียพลังงานไปสิ่งอำนวยความสะดวก WTE เริ่มดำเนินงานในปี 2002 และเป็นพัฒนา โดย CACEM ในการรักษาเสียของอำเภอ 4 มีความจุของ 112,000 tons/yr.34 (30% ของการเกาะของเสีย), รวมถึง 600 ตันของเสียทางการแพทย์ ค่าปริมาณของเสียได้รับอยู่ระหว่าง 8.4 และ 4.2 MJ/kg34 และสร้างระหว่าง 40000 และMWh/yr.34 45000 ไฟฟ้า (4% ของปริมาณการใช้ไฟฟ้าของมาร์ตินีก), ซึ่งเป็นขายในตาราง สิ่งอำนวยความสะดวกที่ประกอบด้วยสองเส้นขนาน ความสามารถในการจัดการ 7 ตัน/ชั่วโมงแต่ละ และทำงาน 8000 hours/year.34