2.2 Phase II of SCRMP
Phase II of the SCRMP includes the steps of risk evaluation and risk mitigation and contingency plans. Both of these steps drawn on evaluation criteria and performance measures for suppliers and logistics, as indicated by the boxes on the right hand side of Figure 1. While it is beyond the scope of the present paper to discuss these criteria and measures, they are an important input for the two steps described in the following