(1) Maximum period when using good quality fuel,(EN 590 standard) this is reduced if the fuel is contaminated and alarms are triggered due to blockage of the filters and presence of water in the pre-filter When blockage of the filter is indicated, it must be replaced. Lf the water in per-filter indicated does not go out after drainage , the per-filter must be replaced.