You will need to make provision of the cable running on the ground (on my sent picture) from the foot of the concrete post to the transformer on slab. So CAD file of your drawing is need to put on scale the location of the place CH. KANCHANG authorized to connect on existing LV line
Thanks to send back your CAD file