. We will put the Fireproof plastic plate inside the electric control panel in dry materials storage warehouse.
2. We will train the staff who responsible for operating electric control panel to have more concern and understand safety standard about inspection control and electrical control cabinet correctly.
3. We will set the engineer to inspect all of electrical cabinet in the factory and correct it if there are found any improper
4. We will provide label and put on new electric control cabinet every time that we install or change them base on updated safety standards and check by local authorities before using.
5. We will set monitoring plan of inspection the electrical control cabinet as monthly and annually.
As observed at Dry Material Storage, 1 of 5 electrical control panel is not totally enclosed.