An interesting result concerning use of procedures at nuclear powered electricity generating plants is that owners have found that overall reliability and capacity factor (ratio of actual output of power in a given period of time compared to maximum authorized output, expressed as a percentage) are enhanced when detailed procedures and checklists are used for all systems, not just those that are safety related. This ensures that the maximum number of generated megawatts are available for sale, assuring maximum plant profitability.