Electrical verification and tests
> Check the continuity of the protective conductor (inter-cell link).
> Carry out an overall measurement of the switchboard insulation and (disconnect the earth plugs of the switchboard as well as all equipment that are sensitive to these tests).
> Check the order of the phases (power supply and feeder).
> Power on the switchboard and check the operating sequences of circuits