My two concerns for this project are as follows
1. The Pre-sling bag shall be laid flat when robot palletize.
2. The stacking bag height shall be maintained 2000mm (200mm X 10 layers) or lower because the robot Z-axis only have 2300mm stroke.
I hope there is a good bag flattener to maintain the bag heights 200mm or under.
If the above conditions can be met, the EC-201HD robot shall be able to handle.
Please find attached quotation.
Please note that the price is based on the new campaign price effective from 1st July 2016 as agreed earlier. (as shown attached)
Best regards,
Isobe / Fuji HK