Should the space between the last sheet and the edge of the roof be less than one third (1/3) the width of a sheet, then the last sheet would be the final sheet and secured down with a cut-off (1/3) fixing clip. The remaining space is later flashed over for watertightness. Finish roof installation with necessary flashing and capping.