For the risk-neutral
solution, the objective is to determine the cycle time to
minimize the expected total cost. For the risk-averse solution,
the model limits the solution space to the set of cycle
times which guarantees an upper bound of defective products
under contingency. The risk management operations research
technology is very useful for the case of a low-probability high-consequence
contingency event.