3.1.1 Removal of public participati

3.1.1 Removal of public participation
The main delay in the EIA process occurs in the public participation and involving public
which will suit and also mandatory only to big projects, this can be removed from the EIA
process for smaller projects since the whole project involves only limited number of persons
and also considering the magnitude of environmental impact this produces smaller impacts.
Also most of the smaller projects will not raise public opposition since it servers to the public
in their needs such as constructing educational institutions, thus its suggested to remove
public participation.
3.1.2 Formation of EIA team
This is one of the major area where modification is needed, for big projects normally a team
comprising of experts from various fields will be involved but it is not necessary in small
projects, an EIA team for smaller projects can be formed with the owner of the property who
sells the land for the project, managing director of the proposed project, one environmental
expert having detailed exposure or various areas of EIA, resource suppliers for the proposed
project, one academician if necessary. Any discussion or decision should be made only after
consulting all members of these team after prior approval.
3.1.3 Preliminary studies to be done
Unlike generic EIA the initial studies should focus much on the resource usage pattern
analysis, land use pattern, material inflow and out flow studies, process control studies, waste
generation and disposal pattern. A detailed study is required to analyze the proposed energy
usage and water usage pattern, mitigative measures are to be proposed before starting the
project. Any study should focus to reduce the resource usage consumption for the full life of
the project and a life cycle analysis if possible can also be performed.
3.1.4 Timeline of EIA process
Generic EIA process is time consuming since it involves in depth study, analysis, discussions
in various levels and also involves public, but its not mandatory for smaller level projects, the
proposed time schedule for a full EIA is about 20 days to 1 months before commencement of
the project. Proper planning and execution should be done while doing EIA to reduce the
time consumed in the full process.
3.1.5 Environmental performance studies
Its proposed to study the local area while doing the EIA and also to do a social impact studies
near the proposed site, smaller projects will not get more public oppose but its necessary for
this projects also. The waste management plan is must for the smaller projects since mostly
the waste management plan will not be designed for any smaller projects and almost all
wastes are dumped in nearby sites. All stake holders including nearby site owners are to be
consulted since it help will help in later stages of expansion or development.
3.1.6 Assessing alternative material usage
The prime importance is to be given to find out the alternate raw material usage both for
construction, operation and maintenance of the project. This should focus to convert the
project into environmentally friendly and also to optimize the resources, increase the
monitory benefit. In regular EIA focus is to be given always to find out the alternate site if
there is any problem but in this the thrust is to be given to find alternate materials to be used
for the process.
3.1.7 Calculation of environmental components
The main components of environment to be calculated in this EIA process includes but not
limited to energy usage, type of energy, alternate energy using chances, water usage, limiting
water usage in various areas, noise measurement, natural resource usage such as paper and
other materials used in the process (Braiassoulis 1989). An environmental matrix can also be
arrived and the effect of various components can be found out using it.
3.1.8 Social responsibility studies
The main aim of the small and medium project in social context is employment to the nearby
people, a detailed study should be incorporated in the EIA process to find out the social
benefit of the project such as employment, revenue generation, social upliftment, land value
modification, impact on environmental ethics and remedial measures should also be
suggested if there are any issues in the findings. If the project supports people in the nearby
locality to the maximum and with less resource consumption immediate approval should be
given in environmental impact statement (EIS). Unlike generic EIA process in modified EIA
more importance is to be given to find out the social impact analysis. The detailed flow chart
of the various activities to be done in the modified Environmental impact assessment is given
in figure 2 which shows the areas where the modifications are to be done to make the EIA
process friendly to small and medium level projects also.
The main details to be collected which are applicable to normal EIA process can also be used
which is given below
1. Can the local environment cope with the additional waste and pollution that the
project will produce? If not what will be alternate to discharge the wastes? Is there
any site nearby?
2. Will the project location conflict with the nearby land use or preclude later
developments in surrounding areas? If yes is there any chance of adjusting to the
nature of nearby site?
3. Can the project operate safely without serious risk of accidents or longterm
health
hazards?
4. How will the project affect economic activities that are based on natural resources?
5. Is there sufficient infrastructure to support the project? Is there sufficient man power
with technical skill to support the project?
6. How much of the resources (such as water, energy etc) will the project consume, and
are adequate supplies of these resources available? How much resources the project
consume in its life time and also per year, what are all the ways to reduce the same?
7. What are all the measures to impart sustainability to the project? How much
beneficial the project is to nearby local peoples?

0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
3.1.1 การกำจัดประชาชน
เลื่อนหลักในกระบวนการ EIA ที่เกิดขึ้นในประชาชนมีส่วนร่วมและเกี่ยวข้องกับสาธารณะ
ซึ่งจะเหมาะ และยังบังคับเฉพาะในโครงการขนาดใหญ่ นี้สามารถถูกเอาออกจาก EIA
ประมวลผลสำหรับโครงการขนาดเล็กเนื่องจากโครงการทั้งหมดเกี่ยวข้องเท่านั้นจำกัดจำนวนคน
และยัง พิจารณาขนาดของผลกระทบสิ่งแวดล้อมนี้ให้เล็กลงส่งผลกระทบต่อการ
ยัง ส่วนใหญ่ของโครงการขนาดเล็กจะไม่เพิ่มสาธารณะฝ่ายค้านตั้งแต่เซิร์ฟเวอร์สาธารณะ
ในความเช่นการสร้างสถาบันการศึกษา ดังนั้นการแนะนำการเอา
สาธารณะมีส่วนร่วม
ทีมก่อ EIA 3.1.2
นี้เป็นหนึ่งในพื้นที่สำคัญที่แก้ไขถูกต้อง สำหรับขนาดใหญ่โครงการปกติทีม
ประกอบด้วยผู้เชี่ยวชาญจากสาขาต่าง ๆ จะเกี่ยวข้อง แต่ก็ไม่จำเป็นในขนาดเล็ก
โครงการ มีทีมงาน EIA สำหรับโครงการขนาดเล็กที่สามารถเกิดกับเจ้าของทรัพย์สินที่
ขายที่ดินโครงการ บริหารโครงการเสนอ สิ่งแวดล้อมหนึ่ง
ผู้เชี่ยวชาญที่มีรายละเอียดความเสี่ยงหรือพื้นที่ต่าง ๆ ของ EIA, ผู้จำหน่ายทรัพยากรสำหรับนำเสนอ
โครงการ academician หนึ่งถ้าจำเป็น สนทนาหรือตัดสินใจใด ๆ ควรจะทำหลังจาก
ปรึกษาสมาชิกทั้งหมดของทีมเหล่านี้หลังจากก่อนหน้านี้อนุมัติไว้
เป็น 3.1.3 ศึกษาเบื้องต้นจะทำ
ต่างจาก EIA ทั่วไป เริ่มต้นศึกษาควรเน้นมากในรูปแบบการใช้งานทรัพยากร
วิเคราะห์ รูปแบบการใช้ที่ดิน นำเข้าวัตถุดิบ และขั้นตอนการ ศึกษา กระบวนการควบคุมศึกษา เสีย
รูปแบบการสร้างและกำจัด การศึกษารายละเอียดจะต้องวิเคราะห์พลังงานเสนอ
แบบใช้น้ำและการใช้งาน มาตรการ mitigative จะเสนอก่อนที่จะเริ่มการ
โครงการ การศึกษาควรมุ่งเน้นการลดปริมาณการใช้ทรัพยากรในชีวิตเต็มของ
โครงการและการวิเคราะห์วงจรได้ยังสามารถทำได้
3.1 ได้4 เส้นเวลาของ EIA กระบวน
กระบวนการ EIA ทั่วไปเป็นเวลานานเนื่องจากจะเกี่ยวข้องกับการศึกษาความลึก วิเคราะห์ สนทนา
ในหลากหลายระดับ และยัง เกี่ยวข้องกับสาธารณะ แต่ไม่บังคับสำหรับโครงการระดับเล็กลง
เสนอกำหนดเวลาสำหรับการ EIA เต็มอยู่ประมาณ 20 วันถึง 1 เดือนก่อนเริ่มดำเนินการ
โครงการ เหมาะสมในการวางแผนและการดำเนินการควรจะทำในขณะที่ทำ EIA เพื่อลดการ
เวลาที่ใช้ในเต็มกระบวนการ
3.1.5 ประสิทธิภาพด้านสิ่งแวดล้อมศึกษา
ที่นำเสนอ เพื่อศึกษาพื้นที่ท้องถิ่นในขณะที่ทำ EIA การ และทำการศึกษาผลกระทบทางสังคม
ใกล้ไซต์เสนอ ขนาดเล็กโครงการจะไม่ได้รับการต่อต้านรัฐมากขึ้นแต่ความจำเป็นสำหรับ
นี้โครงการยัง สำหรับโครงการขนาดเล็กเนื่องจากเป็นแผนการจัดการของเสียส่วนใหญ่
แผนการจัดการของเสียจะไม่ถูกออกแบบสำหรับโครงการใด ๆ มีขนาดเล็กและเกือบทั้งหมด
เสียถูก dumped ในไซต์ที่ใกล้เคียงกัน ผู้ถือเงินเดิมพันทั้งหมดที่รวมทั้งใกล้เคียงกับเจ้าของไซต์จะถูก
ขอคำปรึกษาจะ ช่วยจะช่วยให้ในระยะหลังของการขยายหรือพัฒนา
3.1.6 ใช้วัสดุอื่น Assessing
สำคัญนายกจะได้รับเพื่อค้นหาวัตถุดิบทดแทนการใช้งานทั้งสำหรับ
ก่อสร้าง ดำเนินการ และบำรุงรักษาโครงการ นี้ควรมุ่งเน้นการแปลง
โครงการเป็นมิตรเดินทางสะดวก และยังเพิ่มประสิทธิภาพทรัพยากร เพิ่มการ
monitory ประโยชน์ของการ ใน EIA ปกติ โฟกัสจะได้รับเสมอเพื่อหาไซต์อื่นถ้า
ไม่มีปัญหาใด ๆ แต่กระตุกแบบนี้คือการจะหาวัสดุอื่นที่ใช้
สำหรับกระบวนการ
3.1การคำนวณส่วนประกอบของสิ่งแวดล้อม 7
ส่วนประกอบหลักของสภาพแวดล้อมที่จะคำนวณในกระบวนการ EIA นี้รวมถึงแต่ไม่
จำกัดการใช้พลังงาน ชนิดของพลังงาน พลังงานที่ใช้โอกาสอื่น น้ำใช้ จำกัด
น้ำใช้ในพื้นที่ต่าง ๆ วัดเสียง การใช้ทรัพยากรธรรมชาติเช่นกระดาษ และ
อื่น ๆ วัสดุที่ใช้ในกระบวนการ (Braiassoulis 1989) เมทริกซ์การสิ่งแวดล้อมสามารถ
มาถึง และพบผลของส่วนประกอบต่าง ๆ ออกมาใช้มัน
3.1.8 สังคมศึกษา
จ้างงานเพื่อเป็นจุดมุ่งหมายหลักของโครงการขนาดเล็ก และขนาดกลางในบริบททางสังคมใกล้เคียง
คน การศึกษารายละเอียดควรรวมอยู่ในกระบวนการ EIA ออกสังคม
ประโยชน์ของโครงการเช่นจ้างงานสร้างรายได้ upliftment สังคม ค่าที่ดิน
ยังควรปรับเปลี่ยน ผลกระทบต่อสิ่งแวดล้อมจรรยาบรรณและมาตรการเยียวยา
แนะนำถ้า มีปัญหาใด ๆ ในผลการวิจัย ถ้าโครงการสนับสนุนคนในใกล้เคียง
ท้องถิ่นสูงสุด และ มีปริมาณการใช้ทรัพยากรน้อยลงควรอนุมัติทันที
รับในรายงานผลกระทบสิ่งแวดล้อม (EIS) ซึ่งแตกต่างจากทั่วไปกระบวนการ EIA แก้ไข EIA
ความสำคัญจะได้รับเพื่อค้นหาการวิเคราะห์ผลกระทบทางสังคม แผนภูมิขั้นตอนรายละเอียด
ได้รับผลกระทบของกิจกรรมต่าง ๆ ที่จะต้องกระทำในสิ่งแวดล้อมปรับเปลี่ยน
ในรูปที่ 2 ซึ่งแสดงพื้นที่ที่จะทำการทำ EIA การแก้ไข
ดำเนินโครงการระดับดีขนาดเล็ก และขนาดกลางยัง
ยังสามารถใช้รายละเอียดหลักการรวบรวมซึ่งใช้ได้กับกระบวนการ EIA ปกติ
ที่กำหนดด้านล่าง
1 สามารถสิ่งแวดล้อมท้องถิ่นรับมือกับขยะเพิ่มเติมและมลภาวะที่
จะทำโครงการหรือไม่ ถ้า ไม่อะไรจะปลดเสียอื่น มี
เว็บไซต์ใด ๆ ในบริเวณใกล้เคียง?
2 จะแย้งสถานโครงการ มีที่ดินบริเวณใกล้เคียงใช้ หรือห้ามต่อไป
พัฒนาในพื้นที่หรือไม่ ถ้าใช่มีโอกาสใด ๆ ปรับไป
ของไซต์ที่ใกล้เคียง?
3 สามารถโครงการทำงานอย่างปลอดภัยโดยปราศจากความเสี่ยงร้ายแรงจากอุบัติเหตุหรือตน
สุขภาพ
อันตราย?
4 วิธีจะโครงการส่งผลกระทบต่อกิจกรรมทางเศรษฐกิจที่เป็นไปตามธรรมชาติ?
5 มีโครงสร้างพื้นฐานที่เพียงพอเพื่อสนับสนุนโครงการ มีกำลังคนเพียงพอ
มีทักษะทางเทคนิคเพื่อสนับสนุนโครงการ?
6 จำนวนทรัพยากร (เช่นน้ำ พลังงานฯลฯ) โครงการจะใช้ และ
มีวัสดุเพียงพอของทรัพยากรเหล่านี้หรือไม่ จำนวนทรัพยากรโครงการ
ใช้เวลาของชีวิต และ ต่อ ปี วิธีการลดเหมือนกันคืออะไร?
7 มาตรการทั้งหมดเพื่อความยั่งยืนกับโครงการสอนมีอะไรบ้าง จำนวน
ประโยชน์โครงการจะใกล้เคียงกับคนท้องถิ่น?

การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
3.1.1 Removal of public participation
The main delay in the EIA process occurs in the public participation and involving public
which will suit and also mandatory only to big projects, this can be removed from the EIA
process for smaller projects since the whole project involves only limited number of persons
and also considering the magnitude of environmental impact this produces smaller impacts.
Also most of the smaller projects will not raise public opposition since it servers to the public
in their needs such as constructing educational institutions, thus its suggested to remove
public participation.
3.1.2 Formation of EIA team
This is one of the major area where modification is needed, for big projects normally a team
comprising of experts from various fields will be involved but it is not necessary in small
projects, an EIA team for smaller projects can be formed with the owner of the property who
sells the land for the project, managing director of the proposed project, one environmental
expert having detailed exposure or various areas of EIA, resource suppliers for the proposed
project, one academician if necessary. Any discussion or decision should be made only after
consulting all members of these team after prior approval.
3.1.3 Preliminary studies to be done
Unlike generic EIA the initial studies should focus much on the resource usage pattern
analysis, land use pattern, material inflow and out flow studies, process control studies, waste
generation and disposal pattern. A detailed study is required to analyze the proposed energy
usage and water usage pattern, mitigative measures are to be proposed before starting the
project. Any study should focus to reduce the resource usage consumption for the full life of
the project and a life cycle analysis if possible can also be performed.
3.1.4 Timeline of EIA process
Generic EIA process is time consuming since it involves in depth study, analysis, discussions
in various levels and also involves public, but its not mandatory for smaller level projects, the
proposed time schedule for a full EIA is about 20 days to 1 months before commencement of
the project. Proper planning and execution should be done while doing EIA to reduce the
time consumed in the full process.
3.1.5 Environmental performance studies
Its proposed to study the local area while doing the EIA and also to do a social impact studies
near the proposed site, smaller projects will not get more public oppose but its necessary for
this projects also. The waste management plan is must for the smaller projects since mostly
the waste management plan will not be designed for any smaller projects and almost all
wastes are dumped in nearby sites. All stake holders including nearby site owners are to be
consulted since it help will help in later stages of expansion or development.
3.1.6 Assessing alternative material usage
The prime importance is to be given to find out the alternate raw material usage both for
construction, operation and maintenance of the project. This should focus to convert the
project into environmentally friendly and also to optimize the resources, increase the
monitory benefit. In regular EIA focus is to be given always to find out the alternate site if
there is any problem but in this the thrust is to be given to find alternate materials to be used
for the process.
3.1.7 Calculation of environmental components
The main components of environment to be calculated in this EIA process includes but not
limited to energy usage, type of energy, alternate energy using chances, water usage, limiting
water usage in various areas, noise measurement, natural resource usage such as paper and
other materials used in the process (Braiassoulis 1989). An environmental matrix can also be
arrived and the effect of various components can be found out using it.
3.1.8 Social responsibility studies
The main aim of the small and medium project in social context is employment to the nearby
people, a detailed study should be incorporated in the EIA process to find out the social
benefit of the project such as employment, revenue generation, social upliftment, land value
modification, impact on environmental ethics and remedial measures should also be
suggested if there are any issues in the findings. If the project supports people in the nearby
locality to the maximum and with less resource consumption immediate approval should be
given in environmental impact statement (EIS). Unlike generic EIA process in modified EIA
more importance is to be given to find out the social impact analysis. The detailed flow chart
of the various activities to be done in the modified Environmental impact assessment is given
in figure 2 which shows the areas where the modifications are to be done to make the EIA
process friendly to small and medium level projects also.
The main details to be collected which are applicable to normal EIA process can also be used
which is given below
1. Can the local environment cope with the additional waste and pollution that the
project will produce? If not what will be alternate to discharge the wastes? Is there
any site nearby?
2. Will the project location conflict with the nearby land use or preclude later
developments in surrounding areas? If yes is there any chance of adjusting to the
nature of nearby site?
3. Can the project operate safely without serious risk of accidents or longterm
health
hazards?
4. How will the project affect economic activities that are based on natural resources?
5. Is there sufficient infrastructure to support the project? Is there sufficient man power
with technical skill to support the project?
6. How much of the resources (such as water, energy etc) will the project consume, and
are adequate supplies of these resources available? How much resources the project
consume in its life time and also per year, what are all the ways to reduce the same?
7. What are all the measures to impart sustainability to the project? How much
beneficial the project is to nearby local peoples?

การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
3.1.1 การมีส่วนร่วมของประชาชน
ความล่าช้าหลักในกระบวนการอีไอเอเกิดขึ้นในการมีส่วนร่วมและเกี่ยวข้องกับสาธารณะ
ซึ่งจะเหมาะกับ และยัง บังคับเฉพาะโครงการขนาดใหญ่ นี้สามารถถูกลบออกจากกระบวนการ EIA
สำหรับโครงการที่มีขนาดเล็กตั้งแต่โครงการทั้งหมดที่เกี่ยวข้องกับแค่จำกัดจำนวน
และนอกจากนี้ เมื่อพิจารณาขนาดของผลกระทบต่อสิ่งแวดล้อมนี้ก่อให้เกิดผลกระทบขนาดเล็ก .
ยังส่วนใหญ่ของโครงการขนาดเล็กจะไม่รณรงค์ให้ประชาชนต่อต้านเนื่องจากเซิร์ฟเวอร์สาธารณะ
ในความต้องการของพวกเขาเช่นการสร้างสถาบันการศึกษา ดังนั้น การแนะนำให้ลบ

การศึกษาการมีส่วนร่วมของประชาชน การก่อตัวของทีมอีไอเอ
นี้เป็นหนึ่งในพื้นที่หลัก การปรับเปลี่ยนที่จำเป็นสำหรับโครงการขนาดใหญ่ ปกติทีม
ประกอบด้วยผู้เชี่ยวชาญจากสาขาต่างๆจะเกี่ยวข้องแต่ก็ไม่ได้จำเป็นในโครงการขนาดเล็ก
, EIA ทีมสำหรับโครงการขนาดเล็กที่สามารถเกิดขึ้นกับเจ้าของทรัพย์สินที่
ขายที่ดินโครงการ กรรมการโครงการ หนึ่งสิ่งแวดล้อม
ผู้เชี่ยวชาญมีการรายละเอียด หรือพื้นที่ต่างๆของ EIA ,ทรัพยากรซัพพลายเออร์สำหรับเสนอ
โครงการ , นักวิชาการ หากจำเป็น การสนทนาหรือการตัดสินใจใด ๆควรทำหลังจากเพียง
ปรึกษาสมาชิกทั้งหมดของทีมเหล่านี้หลังจากได้รับอนุมัติก่อน .
3.1.3 การศึกษาต้องทำ EIA ซึ่งแตกต่างจากทั่วไป
เริ่มต้นศึกษาควรเน้นมากในการใช้ทรัพยากรแบบ
การวิเคราะห์ รูปแบบการใช้ที่ดิน การไหลเข้าและไหลออกของวัสดุการศึกษา ,การศึกษากระบวนการควบคุม และการกำจัดขยะ
รุ่นรูปแบบ ศึกษารายละเอียดจะต้องวิเคราะห์ เสนอใช้รูปแบบการใช้น้ำและพลังงาน
มาตรการบรรเทาต้องเสนอก่อนเริ่ม
โครงการ มีการศึกษาควรเน้นการลดการใช้ ทรัพยากรที่ใช้ ชีวิตเต็มไปด้วย
โครงการและการวิเคราะห์วัฏจักรชีวิต ถ้าเป็นไปได้ยังสามารถดำเนินการ .
1 .4 ระยะเวลาของกระบวนการ EIA อีไอเอกระบวนการ
เป็นเวลานาน เนื่องจากเกี่ยวข้องกับการศึกษาความลึกของการวิเคราะห์ อภิปราย
ในระดับต่างๆ และยังเกี่ยวข้องกับสาธารณะ แต่ไม่บังคับสำหรับโครงการระดับเล็ก
เสนอตารางเวลาสำหรับ EIA เต็มประมาณ 20 วัน ถึง 1 เดือน ก่อนเริ่มการ
โครงการ การวางแผนที่เหมาะสมและควรทำในขณะที่การทำ EIA ลด
เวลาที่ใช้ในกระบวนการเต็มประสิทธิภาพด้านสิ่งแวดล้อมศึกษา

3.1.5 ของตนที่เสนอเพื่อศึกษาท้องถิ่นในขณะที่ทำ EIA และยังต้องศึกษาผลกระทบทางสังคม
ใกล้เสนอเว็บไซต์โครงการขนาดเล็กจะไม่ได้รับประชาชนคัดค้าน แต่จำเป็นสำหรับ
โครงการนี้ยัง แผนการจัดการขยะจะต้องสำหรับโครงการขนาดเล็ก เนื่องจากส่วนใหญ่
แผนการจัดการขยะจะไม่ได้ออกแบบสำหรับโครงการใด ๆ มีขนาดเล็ก และขยะเกือบทั้งหมด
ถูกทิ้งในสถานที่ใกล้เคียง ผู้ถือหุ้นทั้งหมด รวมทั้งเจ้าของเว็บไซต์ที่เป็น
ปรึกษาเพราะมันช่วยจะช่วยหลังจากขั้นตอนของการขยายตัว หรือการพัฒนา การประเมิน การใช้วัสดุทดแทน 3.1.6

เพื่อให้ความสำคัญของนายกรัฐมนตรีเพื่อหาแนวทางการใช้วัตถุดิบอื่นทั้ง
ก่อสร้าง , การดำเนินงานและการบำรุงรักษาของโครงการ นี้ควรเน้นเพื่อแปลง
โครงการเป็นผลิตภัณฑ์ที่เป็นมิตรกับสิ่งแวดล้อมและการเพิ่มประสิทธิภาพของทรัพยากร เพิ่ม
ประโยชน์เกี่ยวกับหมายเรียก . ในโฟกัสอีไอเอปกติคือการได้รับเสมอเพื่อดูเว็บไซต์อื่นถ้า
มีปัญหาใด ๆแต่นี้เป็นแรงผลักดันให้ หาวัสดุอื่นเพื่อใช้สำหรับกระบวนการ
.
1 .7 การคำนวณองค์ประกอบสิ่งแวดล้อม
ส่วนประกอบหลักของสิ่งแวดล้อมที่จะถูกคำนวณในกระบวนการ EIA ซึ่งรวมถึง แต่ไม่ จำกัด การใช้พลังงาน
, ประเภทของพลังงานสำรองพลังงานโดยใช้โอกาสการใช้น้ำ การใช้น้ำในพื้นที่ต่าง ๆ
, วัดเสียง , การใช้ทรัพยากรธรรมชาติ เช่น กระดาษ และวัสดุอื่นๆที่ใช้ในกระบวนการ
( braiassoulis 1989 )เป็นเมทริกซ์สิ่งแวดล้อมยังสามารถ
มาถึงและผลของส่วนประกอบต่าง ๆที่สามารถพบได้จากการใช้มัน 3.1.8 ความรับผิดชอบทางสังคมการศึกษา

เป้าหมายหลักของโครงการขนาดเล็กและขนาดกลางในบริบททางสังคม คือ การจ้างงานที่ใกล้เคียง
คน ศึกษารายละเอียดที่ควรจะรวมอยู่ในกระบวนการ EIA เพื่อหา
ประโยชน์สังคม ของโครงการ เช่น การจ้างงาน การสร้างรายได้upliftment สังคม ปรับเปลี่ยนค่า
ที่ดินส่งผลกระทบต่อจริยธรรมด้านสิ่งแวดล้อมและมาตรการเยียวยาควร
แนะนำหากมีปัญหาใด ๆ ในการค้นพบ ถ้าโครงการสนับสนุนประชาชนในท้องที่ใกล้เคียง
ให้สูงสุดและลดการบริโภคทรัพยากรที่ควรจะได้รับการอนุมัติทันที
ในรายงานผลกระทบต่อสิ่งแวดล้อม ( อีไอเอส ) ซึ่งแตกต่างจากทั่วไปในกระบวนการ EIA อีไอเอ
ดัดแปลงที่สำคัญคือการได้รับเพื่อดูการวิเคราะห์ผลกระทบทางสังคม รายละเอียดแผนภูมิการไหล
ของกิจกรรมต่างๆที่ต้องทำในการแก้ไขผลกระทบสิ่งแวดล้อมให้
ในรูปที่ 2 ซึ่งแสดงให้เห็นพื้นที่ที่การเปลี่ยนแปลงจะต้องทำเพื่อให้กระบวนการ EIA
เป็นกันเองกับโครงการระดับขนาดกลางและขนาดเล็กยัง .
รายละเอียดหลักของการจัดเก็บซึ่งใช้กับกระบวนการอีไอเอปกติยังสามารถใช้ที่ระบุด้านล่าง

1 . สิ่งแวดล้อมท้องถิ่นสามารถรับมือกับการเพิ่มขยะและมลพิษที่
โครงการจะผลิต ? ถ้าไม่ใช่แล้วจะสลับกับการปล่อยของเสีย ? มี
เว็บไซต์ใดที่ใกล้เคียง ?
2 . จะ สถานที่ตั้งโครงการ ขัดแย้งกับการใช้ที่ดินใกล้เคียงหรือดักคอในภายหลัง
การพัฒนาในพื้นที่โดยรอบ ? ถ้าได้มีโอกาสปรับ
ธรรมชาติใกล้เคียงเว็บไซต์ ?
3 สามารถใช้งานได้อย่างปลอดภัยโครงการโดยไม่ต้องเสี่ยงของอุบัติเหตุร้ายแรงหรือเป็นอันตรายต่อสุขภาพระยะยาว

?
4 จะส่งผลกระทบต่อกิจกรรมทางเศรษฐกิจในโครงการที่อยู่บนพื้นฐานของทรัพยากรธรรมชาติ
5 มีเพียงพอโครงสร้างพื้นฐานเพื่อสนับสนุนโครงการ มีกำลัง คนเพียงพอ
มีทักษะด้านเทคนิคเพื่อสนับสนุนโครงการ
6 วิธีการมากของทรัพยากร ( เช่น น้ำ พลังงาน ฯลฯ ) จะโครงการกิน และมีเสบียงเพียงพอ
ทรัพยากรเหล่านี้สามารถใช้ได้ ? เท่าใดทรัพยากรโครงการ
บริโภคในช่วงชีวิตของมัน และต่อปี อะไรคือวิธีการทั้งหมดเพื่อลดเหมือนกัน
7 สิ่งที่เป็นมาตรการที่จะบอกอย่างยั่งยืนกับโครงการ ? เท่าไหร่
เป็นโครงการที่ประชาชนในท้องถิ่น ?

การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2024 I Love Translation. All reserved.

E-mail: