The system was verified for the implement width, effective field capacity, drawbar power, required PTO power and fuel consumption by using published data from Sumner and William (2007) as shown in Table 1. It was observed that, as soon as entering input data the unit displays the results. The predicted results were identical to that obtained by Sumner and William (2007). This means that, the unit is able to calculate the required parameters correctly