1. Deven process = we will no open the boxes and refer the supplier label with invoice ( match or not???).
2. Unpack prcess = we will open the boxes supply the parts for production line and the point blown at supplier label shown part number AB39-2121978-AC but actual part number inside package is AB39-2121979-AB