1.3 The other impact from transportation (Dust problem)
Complain: C6 - No cover sheet for the transportation of dusty material
C7 - The spread of dust along the transportation route
Conclusion from the meeting:
a) The transportation of the concrete scrap/soil to outside should be perform in the specified
transportation route only, Please be warned that the complaint for the house cracking and
properties damage may be occurred at any route.
b) The cover sheet should be used and check by the security guard before allow to go outside.
c) For laydown area 6/7 and 8, the entrance gate was already provide the water spraying by
security guard, paving and wheel washing.
d) The daily sweep of the transportation route (from KEGCO entrance gate to laydown area
8) will be done, and the weekly cleaning will be done and community will join The
Onshore Consortium. (to be conducted on April 19th,2015 and in weekly basis continually)
e) Owner will support the raw water to use for this case according to EPC schedule#13
Onshore Consortium