The mixtures used in the tests, in addition to 100% outlet, are the following: 25% inlet/ 75% outlet, 50% inlet/50% outlet and 100% inlet (wastewater incoming at WWTP)
The mixtures usedin the tests, in addition to 100% outlet, are the following: 25% inlet/75% outlet, 50% inlet/50% outlet and 100% inlet (wastewaterincoming at WWTP)