example is a small concrete bridge, and the second is a small
highway rehabilitation project. Both projects were selected,
because they represent two different types of projects; the latter
is linear and continuous and the former is discrete and
noncontinuous. The following sections will briefly describe
each project. After the description, a discussion and an evaluation
of how each scheduling technique performs with regard
to planning and analysis, resource integration, and execution/
control dimensions is presented.