Required:
a. Create a data flow diagram of the current system.
b. Create a system flowchart of the existing system.
c. Identify the internal control weaknesses in the system.
Model your response according to the six categories
of physical control activities specified in the
COSO internal control model.
d. Prepare a system flowchart of a redesigned
computer-based system that resolves the control
weaknesses you identified.