3. Number of Despatcher not enough PP need to wait despatcher to checking the product before loading
Last night, I get confirm from Dispatch have 6 GR to support this activity. From my opinion it enough by use ratio 1 GR with 3 Loader.
For this issue, I assign supervisor to monitor closely and record actual HC both DC and Pen Pond to make us understand more than this information.