The costs of removal were very low for both capital and O&M. The life-cycle cost for TP removal was $2.21/lb of TP removed, while the life-cycle cost for TN removal was 00.98/lb of TN removed, including the cost for methanol. The capital cost for the flow capacity was $0.58/gallon per day (gpd) capacity.