Dear K. Phongphisit,
Please separate the original scope & additional works when making estimate same as before, so we can easily check and understand the identity- cause first contract will also separate from original scope & additional.
1. Original scope- 1st PO will issue after confirmation and negotiation of estimate with drawings identification.
2. Additional M & E work- shall be issue separate PO- marked additional works-1, 2 3 & so forth.
1.1 Identity of original scope- 1st estimate submitted- but final estimate shall be use the revised latest drawings issued by Gamma with date.
2.1 Identity of additional works- Basically not included from item 1, like production machines power supplies, Air piping to machines & main piping to air main air compressor main pipes, ducts for laser machines & others works which are not indicated in drawing & BQ of item 1.
Maker list for M & E materials & Equipment's as follows;
1. Fire alarm- Notifier- smoke detector model 2151/2151T
2. Cables & wires- Thai Yazaki
3. Wire way, cable ladder, conduit pipes- Panasonic/National/Matsushita- please check and confirm if price are ok & delivery can meet schedule?
4. HDPE pipes- SCG, GSP pipes- NTS
5. Septic tank- SCG
6. MDB & Panels & Circuit breaker(CB) & Power Monitoring- Asefa panel- Mitsubishi for CB's & power monitoring
7. Sirico fan for Laser machine- Panasonic
8. Sanitary fixtures -Cotto
9. Other materials- follow- list catalog submitted by Gamma- k. Tee- make list and issue to sub-contractor
Best regards,
Andy Abella
Gamma Engineering Co., Ltd.
Dear K. Phongphisit,Please separate the original scope & additional works when making estimate same as before, so we can easily check and understand the identity- cause first contract will also separate from original scope & additional.1. Original scope- 1st PO will issue after confirmation and negotiation of estimate with drawings identification.2. Additional M & E work- shall be issue separate PO- marked additional works-1, 2 3 & so forth.1.1 Identity of original scope- 1st estimate submitted- but final estimate shall be use the revised latest drawings issued by Gamma with date.2.1 Identity of additional works- Basically not included from item 1, like production machines power supplies, Air piping to machines & main piping to air main air compressor main pipes, ducts for laser machines & others works which are not indicated in drawing & BQ of item 1.Maker list for M & E materials & Equipment's as follows;1. Fire alarm- Notifier- smoke detector model 2151/2151T2. Cables & wires- Thai Yazaki3. Wire way, cable ladder, conduit pipes- Panasonic/National/Matsushita- please check and confirm if price are ok & delivery can meet schedule?4. HDPE pipes- SCG, GSP pipes- NTS5. Septic tank- SCG6. MDB & Panels & Circuit breaker(CB) & Power Monitoring- Asefa panel- Mitsubishi for CB's & power monitoring7. Sirico fan for Laser machine- Panasonic8. Sanitary fixtures -Cotto9. Other materials- follow- list catalog submitted by Gamma- k. Tee- make list and issue to sub-contractorBest regards,Andy AbellaGamma Engineering Co., Ltd.