Dear Sir
I would like to information trial part input machine.
Part name 3ST Drum (Machine date 14-19/Sep/16)
Lot 6824
Q’ty 50 pcs.
Countermeasure gas after machine
All part are delivery to customer. (as cast inspection check result is OK)
Machine please separate as cast NG after machine (lot 6824).
For casting engineer check defect.