Write a sub procedure named Calculate_TPM_Values that calculates availability, performance,
quality, and overall equipment effectiveness (OEE) based on the total productive maintenance
(TPM) method. TPM is a method to increase the effectiveness of production environments,
especially through methods for increasing the effectiveness of equipment. The following formulas
should be used to calculate the required outputs1: