The computer was delivered in December. Coordinating
several construction contractors is a big job. It took IBM
about 2 weeks to test and get the system operating.
Terminating signals and grounding was fairly time consuming.
Use of the process-variable code designated for
DDC programs in all installation drawings kept confusion
to a minimum. The computer was also used to ring out
wiring.