2. Installment
2.1 Groundwork of machine installment the machine should be installed on the bases of concrete the thickness of which is more than or equal to 150 mm. After adjusting machine, using the swelled bolt
To fix (see picture 4)
2.2 Environment requirement while safety using machine:
The machine should be used under temperature 0-40°C
The machine’s working environment humidity should be 35-85%
The machine’s safely used voltage should be 380 V.
2.3 Work district of safely using machine
The front and back side of machine should reserve /meter to operate and examine and repair the left and right side of machine should guarantee the open of channels of glass blanking.
Chapter 4 Machine introduction
1. General equipment illustration of machine
If the customers do not have special requirements, please delver goods according to routine equipment as follow
1) The host of AD11325-45°
2) Square glass support frame structure
3) Chain into feeding guide
4) Chain feeding guide
2. Choose accessories available instructions of machine customers could choose machine accessories below according to their need.
1) Aluminum alloy roller type glass support frame
2) Belt type feeding guide
3) Synchronous belt type discharging guide
4) Chain type lifting feeding guide rails
5) Synchronous belt lifting type feeding guide
Chapter 5 Debugging and operation
1. Check points of machine operations
Operation position and check points of machine operations should put glasses into the transmission guide rail on the right side of the machine, after the glass being put into front and rear rail, controlling machine’s feed speed and grinding capacity, facing the control cabinet, when the glass is rubbed, transferring it from the transmission guide rail on the right side of the machine, operations should check the grinding quality of glass on the left side of the transmission guide rail.