Please give me some advice and direction. Should we wait the OLT response?
From my understanding, the simply way and the best solution are we should refer back to the original procedures of London (not only DC procedures but the whole package) to review, discuss and conclude before final updating. However, this is the sensitive case which will change the way of the two offices operate. I mean the local culture and all local staff of two offices which may have to follow the winner.
Refer to item 2 of Khun Dave, Bangkok also faces the same situation and i think if the OLT decided to develop the in-house database. We should have a well plan of a big development to solve these problems in the same time.
I am afraid that i would accidentally agree with one side and he or she might assume that it's the majority vote.