A strategic timber harvest scheduling model was formulated in
order to meet the requirements (demands) listed in the forest
management plan, which are described below as exogenous
constraints. The planning horizon extended over two rotation
intervals. However, the model included constraints beyond the
planning horizon, as explained below. The mathematical formulation
can be seen in Appendix A