Example 2. Team Member in first workstation installs radiator and hand starts 3 bolts. The remaining 4 bolts are installed in a workstation downstram the 7 bolts that hold the radiator in place are taken to full torque by a DC nut runner that is error proofed (error proofing ensures all 7 bolts are to full torque). Because there is error proofing (must be error prevent not error detect) in place and there is no way a defect can leave the second workstation; full points are awarded to both workstations(10 points)