7.5.1.4Preventive and predictive maintenance
The organization shall identify key process equipment and provide resources for machine/equipment maintenanc
and develop an effective planned total preventive maintenance system. As a minimum, this system shall include th
following:
—planned maintenance activities;
—packaging and preservation of equipment, tooling and gauging;
—availability of replacement parts for key manufacturing equipment;
—documenting, evaluating and improving maintenance objectives.
The organization shall utilize predictive maintenance methods to continually improve the effectiveness and th
efficiency of production equipment.