Five consecutive batch of incoming material ,if 2 batch of the 5 batch is not accepted.,Change the scheme to right inspection,if there is no wrong with the following five batch,then instead of conventional sampling inspection(in connection with performance,the proportion of rightn inspection than the original double).when incoming material during the whole of month is ok, change the perform of loosening inspection, loosening inspection scheme just in view of the packaging、visual inspection.