In this conclusion
Fluctuations in power PV generator has been tempered by a battery energy storage system
(Bess) in order to maintain the output power of PV generator to stabilize and improve .
Voltage quality Mae-Sariang micro-grid system is presented to evaluate the coordinates of a battery energy storage system
(Bess) to coordinate with the appropriate technique to generate the reference voltage
.Together with the creation of reference line power with a linear exponential smoothing (LES)
Simulation results show that the size of the coordinates 350.7 KJ power and 3,350.4 KW electrical power is rated at Appropriateness of the battery energy storage system (Bess) sufficient for improving the quality of
Voltage Mae-Sariang micro-grid to meet the standards set. In both normal power conditions. (Normal dispatch) and independent state separation (islanding condition), however, the coordinates are the coordinates
independent state separation (islanding condition) with rated power higher than normal power conditions about 2
.Therefore, to get the coordinates of a battery energy storage system (Bess) covering the use of the two conditions must be invested
higher. Separate independent state, but usually occurs only for a short time only
.Investment considerations in view of economics for installation dimensions of the energy storage system with battery
(Bess), there should be more in the future.