However, that equation does not take into consideration the effects of changeover time and the length of production runs. Table 9-2 shows theoretical and actual production rates, based on the bar diagram (Figure 9-7) provided by Larson (1978), that may be expected from a 3-ton capacity horizontal mixer operating on a 5.5-minute mixing cycle at run lengths from one batch (3 tons) to infinity.