The oxygenation of the pile was provided with an industrial aeration system through a perforated drainage-pipe network at two different depth of the soil pile. Moisture was maintained at approximately 40-50% .
The oxygenation of the pile wasprovided with an industrial aeration system through a perforated drainage-pipe network at two different depth of thesoil pile. Moisture was maintained at approximately 40-50% .